See the ground that can take power this decade.

The grid queue runs years. The ground that can take load sooner is scarce and unlisted. Terminus X builds screening instruments that find it early, from public data, with every input labeled.

Request a seat
Private beta · public data, US first · seat required
Land check

Is your ground a candidate?

Three questions. No email to see the result. An honest no if it isn’t a fit.

Question 1 of 3
How many acres in one tract?

One tract matters more than total. A compact block beats a larger scattered holding.

Question 2 of 3
Is there a pipeline or power line on or near the property?

This is the single strongest signal. Select everything that applies.

Question 3 of 3
Is there water on the property?

A well, a spring, a stock pond, or water rights. It need not be potable.

Nothing here is stored or sent anywhere until you choose to send it.

If you own land

Find out what your county scored. And why.

We score counties for how quickly power can realistically be delivered. Ask about yours. The score, the factors, the sources.

Ask about your county
If you build or deploy capital

Send us your shortlist. We will screen it.

Send the sites you are already considering and we will run them through the same framework behind Groundwork. Power deliverability, pipeline and transmission proximity, water, terrain, hazard, and county permitting posture. You keep the analysis. Each engagement is fixed-scope.

Send a shortlist
Instruments

One method. Three constraints.

Named screens on binding physics: land, sky, plant. Screening-grade. Never a ranked list.

Instrument · private beta

Time-to-power

Groundwork

Data-center land screen. Power, gas, water and fiber from public data with honest labels, plus county posture, on request. Private beta, seat required.

Request a seat
Method demo

Sky hours

Window

Clear-sky hours for optical and Ka-band ground stations, from public ERA5 weather data.

window.tools
Method demo

Plant siting

Mill

Site screen for robotics and advanced-manufacturing plants. Power, water, rail, building volume, county.

mill.tools
Practice

Most sites that look good on a map cannot be energized this decade. The work is separating the two, early, with evidence anyone can check.

01

Instruments

Purpose-built screens for one binding constraint each. Groundwork for time-to-power, Window for sky hours, Mill for plant siting.

02

Screening

Every candidate scored against a consistent framework: power deliverability, transmission and pipeline proximity, water, terrain, hazard exposure, cost basis, and the demonstrated permitting posture of the county itself.

03

Verification

Public data establishes the shortlist. It does not close the question. Where an operator or county fact changes the answer, the screen says it needs verification and labels it so.

04

Labels

Every input is marked live, curated, snapshot or modeled, with its source and date. Where the evidence is too thin, the screen says so instead of guessing.

Research note

The industry prices land in dollars per acre. The constraint is measured in months.

August 2026 · Terminus X Partners · All research

The scarce input in data-center development is no longer capital, land, or even megawatts in the abstract. It is a date · the day a site can actually take load. Almost every other variable is negotiable. That one is not, and it is set years before anyone breaks ground.

Large loads seeking a conventional grid connection in most of the United States join a queue measured in years. The consequence is a widening gap between two things that look identical on a parcel map: ground that is near power, and ground that can be energized. The first is abundant and cheap. The second is scarce and almost never priced correctly, because the people selling land price it as land.

A site that can be energized in twenty-four months and a site that can be energized in seventy-two are not the same asset at different prices. They are different assets.

What on-site generation actually changes

Behind-the-meter generation · gas, geothermal, solar, or a combination · does not make power cheaper. Frequently it makes it more expensive per megawatt-hour. What it does is take the schedule out of someone else’s hands. For a developer whose model depends on a commercial operation date, paying a premium per megawatt-hour to remove multi-year schedule risk is not a concession. It is the entire transaction.

What is scarce is ground where that trade can be executed.

Why the constraint has not reached land prices

Three frictions. First, the information is hard to assemble: pipeline capacity, interconnection posture and county political appetite live in different places, in different formats, and much of it is not published at all. Second, the parties holding the best ground · multi-generational family holdings, absentee owners, family trusts · are not listing it and are not reading data-center trade press. Third, and most underrated, the binding constraints are frequently political rather than physical. A county with excellent physical characteristics and a hostile electorate is not a site.

257%
Rise in pipeline construction cost, 2006–2024, as cited by an interstate operator to a state legislature
“Fully subscribed”
How that operator described its own regional transmission and firm storage capacity in January 2026 testimony

What follows

If time-to-power is the binding constraint, the correct unit of analysis is neither the parcel nor the county. It is the convergence · ground where a fuel source, a transmission path, adequate non-potable water, tolerable terrain, and a county that has demonstrably said yes all occur in the same place. Those convergences are rare, and they can be identified in advance from public data.

What this analysis cannot tell you

Much of the data required to price these sites is modeled, not measured. Our instruments stay screening-grade, not underwriting. Pipeline utilization is inferred from public filings and operator testimony rather than metered. County posture is a judgment formed from ordinances, ballot outcomes and permit decisions · evidence, not a number. Any framework reporting these with false precision, or quietly omitting a factor it could not resolve, is producing confidence rather than information.

Our practice is to label modeled inputs as modeled, to state the source and date of every material figure, and to refuse to produce a verdict where too much of the evidence is missing. A screen that declines to answer is more useful than one that guesses well.

Sources. Construction-cost and capacity figures from WBI Energy, Montana Natural Gas Transportation, presentation to the Montana Energy and Technology Interim Committee, January 2026 (cost index attributed therein to INGAA), retrieved from the Montana Legislature interim committee archive. General market commentary. Not investment advice, and not an offer or solicitation.
For landowners

What a developer actually looks for

Plain answers to the questions we are asked most often. Nothing here obliges you to anything.

Do I have to sell my land?
No. Most of the ground worth having is not for sale, and it does not have to be. An option or a long-term lease keeps the property in your family while putting it to work. Ground leases are common for this use.
What makes ground attractive for a data center?
Power first, and nothing else is close. Ground near a gas pipeline with spare capacity, or with geothermal or solar potential, can be powered on site instead of waiting years in a grid interconnection queue. After power: single-tract acreage, gentle terrain, non-potable water, and a county with a track record of approving industrial energy projects.
How much land is needed?
Campus scale · typically several hundred acres in one tract. Shape and tract unity matter as much as total size. A compact block is worth more than a larger scattered holding.
Does a pipeline or power line crossing my property matter?
Considerably. An existing pipeline or transmission corridor on or near your ground is one of the strongest indicators that a site can be powered without a multi-year wait. What most owners treat as an easement nuisance is frequently the most valuable feature of the property.
What is ground like this actually worth?
It depends on what can be delivered there, not on what the land next door sold for. Ground that can be energized this decade trades on a different basis from grazing or farm ground · and the honest answer is that nobody, including us, can put a number on yours before a full site package is complete. Anyone who quotes you a figure on the first phone call is guessing with your property. What we can tell you quickly is whether your ground has the markers that make that conversation worth having.
Are you a broker?
No. We do not list property and we do not take a commission. We screen ground against public data and tell you plainly what it shows.
What does a first conversation involve?
A phone call. We will tell you what your county scored and why, what we can see about your ground from public records, and whether it is the sort of parcel that matters. If it isn’t, we will tell you that too and you will have lost twenty minutes.
What we license
Terminus X licenses methodology and county-level regulatory intelligence. It does not sell target lists.
  • Available. The screening framework, and county-level permitting posture · ordinances, moratoria, ballot outcomes and conditional-use decisions, sourced and dated.
  • Available. Independent screening of sites you already hold or are considering.
  • Not available. Ranked target lists or owner identification.
A no is a result. A county can have excellent physical characteristics and still be the wrong place. A restrictive setback ordinance, a defeated project, or an organized electorate will do it. Knowing where not to go is worth more than another list of places that look good on a map.
The firm

Built and run by one operator, directing AI agents that build public-data siting screens.

Terminus X Partners, LLC · Utah · Dallin Watts

The person who built the instrument is the person who reads your sites.

On method
Consistent scoring across every candidate, so sites are comparable rather than argued for individually.
On data
Modeled inputs are labeled as modeled. Where a figure cannot be sourced, that is reported rather than filled in.
On corrections
Where a figure is superseded we correct it in place and date the correction. That includes when the correction cuts against our own interest.
On the name
Terminus was the Roman god of boundary markers · the stone that settled where one holding ended and the next began. Neighbors honored the marker because every claim depended on it staying exactly where it was set. That is the standard for our data.
Private beta

Request a seat

Private beta. We’ll reply to the email you leave.

Seat request received.

We’ll follow up at the email you provided.

Please add your name.
Which company?
We need an email to reply.
Your role, briefly.
One line is enough.
Contact

Start a conversation

Landowners

Ask what your county scored.

Received.

We’ll look at your county and reply.

Please add your name.
We need a way to reply.
Which county is the ground in?
Partners · Operators · Licensing

Shortlist screening or a licensing inquiry.

Inquiry received.

We’ll reply at the email you provided.

Please add your name.
Which firm?
Please add a valid email.
A sentence is plenty.
CoveragePublic data, US first
PracticeScreening instruments
Three questions, thirty seconds, honest answer.
Check your land